タグ - my future my choice

Marion County Board to Do Cost Study and Two Engineering StudiesWJBD OnlineThe board approved a $6,720 contract with WRF Engineering to look at the replacement of the rooftop air handling system that is now 40 years old. Building Committee Chair Dr. Creigh
Admin 12.10.2017 0 95

Local 10Elementary school girls in Plantation prepare for engineering state competitionLocal 10PLANTATION, Fla. - At Mirror Lake Elementary School in Plantation, students in second through fifth grade are building robots, writing code and laying the buildi
Admin 12.10.2017 0 184

ENGINEERING.comIncredible Feats of Structural Engineering: SCIA User Contest 2017 ...ENGINEERING.comSCIA makes structural engineering software for steel and composite design as well as for designing concrete sections of buildings, and this year the company
Admin 12.10.2017 0 78